C/Port and Multi Video ExpanderUser’s Guide
x • Prefaceequipment is put into service. Please refer to the installation sections of this manual for specific power cord requirements. For replaceme
C/Port • 1Chapter 1. ClearCube C/Port OverviewThe ClearCube architecture delivers Intel-based PC functionality to the desktop from a secure, centraliz
2 • ClearCube C/Port OverviewC/Ports are connected via standard twisted-pair copper networking cables: CAT5, CAT5e, CAT6, or CAT6e. Table 1 lists the
Fiber Solution • 3Fiber SolutionThis section describes:• C7420 Fiber C/Port• F6150–160 fiber transceiverC7420 Fiber C/PortThe C7420 is connected to an
4 • ClearCube C/Port OverviewFigure 2. C7420 Fiber C/PortFor more information about setting up your C7420, about connecting devices to the C7420, and
Multi-Video Expander • 5Multi-Video Expander The ClearCube Multi-Video Expander (MVX) provides a revolutionary way to multi-task and process informati
6 • ClearCube C/Port OverviewCable RequirementsThe ClearCube chassis uses standard network cables with RJ45 connectors to connect to C/Ports and to an
Cable Requirements • 7The following figure shows a typical cabling configuration to connect C7420 Fiber C/Ports to an A3100 chassis. Note the recommen
8 • ClearCube C/Port Overview
Caution Statements • 9Chapter 2. C/Port InstallationCaution StatementsImproper connection, mounting, or use of this product could result in component
Technical SupportPlease refer to our support website for technical updates, additional warranty information and documentation, and software revisions:
10 • C/Port InstallationC7130 and C7120 C/Port InstallationThe model C7130 C/Port provides automatic sharpness tuning that simplifies installation. Wh
C7130 and C7120 C/Port Installation • 11Identifying your Chassis R4300 and R4200 chassis can easily be identified in your data center. Figure 6 on thi
12 • C/Port InstallationInstalling the C/Port on the DesktopIf you do not have easy access to the data center to determine whether you are connecting
C7130 and C7120 C/Port Installation • 132. Locate your C/Port in a ventilated area away from any heat sources. Do not stack your C/Port on top of moni
14 • C/Port Installation 6. Connect the C/Port power supply module to the C/Port power input, and then plug the power supply into the AC power socket.
C7130 and C7120 C/Port Installation • 15Before Tuning a C/PortDownload the ClearCube C/Port Tuning Guide, Tuning a C7130 Connected to an R4300 Chassis
16 • C/Port Installation2. Change the three color tuning switches from position F to position 1. The colors should be in better alignment. 3. View the
C7130 and C7120 C/Port Installation • 17On the C7130, when color alignment is complete on a fine-tuned automatic alignment, all three switches must be
18 • C/Port InstallationLocking out Mass Storage Devices An additional feature provides increased levels of security with C/Ports. The R Series PC bla
C7130 and C7120 C/Port Installation • 19Figure 12. Model R1300 MSL Jumper Location and Settings Figure 13. Model R2100 MSL Jumper Location and Setti
iiiContentsPreface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20 • C/Port InstallationC7420 Fiber C/Port InstallationClearCube C7420 Fiber C/Ports connect to ClearCube A1410 and R1350 PC blades to provide the fol
C7420 Fiber C/Port Installation • 21Understanding C7420 LED IndicatorsThe following lists detail the LED indicators on the front and rear of the C7420
22 • C/Port InstallationUnderstanding Default Network AddressesThe C7420 Fiber C/Port and V5120 Dual Host are initially configured for DHCP connection
C7420 Fiber C/Port Installation • 231. Ensure that you have connected devices as described in “Setting up the C7420 Fiber C/Port” on page 20.2. Connec
24 • C/Port Installationf. Click Configuration > Session. Ensure that the Accept Any Peer option is clear. In the Peer MAC Address line, type the M
C7420 Fiber C/Port Installation • 25c. From the Tera1200 PCoIP Processor menu, click Configuration > Monitor Emulation. Select the monitor emulatio
26 • C/Port Installation
Hardware Installation • 27Chapter 3. MVX Installation Hardware InstallationInstalling the Video AdapterIf you ordered your multi-video system pre-conf
28 • MVX InstallationNote: The monitor connector ends of each splitter cable are stamped with either a 1 or a 2 to indicate the output sequence order.
Software Installation and Configuration • 29Once the C/Port has been installed and the blade has been powered up, the user needs to fine tune the vide
ivC7420 Fiber C/Port Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30 • MVX Installation7. Click Change/Remove and Yes at the next prompt to remove the currently installed NVIDIA drivers. 8. Click OK to restart the co
Software Installation and Configuration • 315. Set the resolution to 1280 x 1024 (not all flat panel monitors support resolutions greater than 1024 x
32 • MVX Installation8. On the side window, click ClearView. Figure 21 shows the resulting screen and the default 1x1 display configuration. 9. In the
Software Installation and Configuration • 3310. Click Desktop Utilities in the ClearView side window.11. Click the Enable Desktop Manager check box, c
34 • MVX Installationoptimized for use with ClearCube Multi-Video equipment. Individual settings can be changed if desired. 14. Continue with the rema
Important Notes about MVX • 35• The video sharpness and color switch settings on the C/Port apply to all monitors. • In Windows XP, changing display s
36 • MVX Installation
Troubleshooting • 37Appendix A. TroubleshootingIf you have any problems with your system, please check the following items prior to calling for suppor
38 • TroubleshootingLoss of peripheral devices (USB) • Unplug and re-plug-in the devices.• Pull blade out and re-insert. No video or link lights at de
Troubleshooting • 393. Select Enable VGA Mode and press the Enter key.4. Once booting completes, set the display to a supported setting and restart th
vDeclaration of Conformity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
40 • [email protected] Email address to ClearCube Technical Support support.clearcube.com ClearCube Support Web site support.clear
Specifications • 41Appendix B. SpecificationsC/PortTable 6. C/Port SpecificationsConnections• VGA monitor connection (standard DB-15) • RJ-45 for PC
42 • SpecificationsC7420 Fiber C/PortMVXTable 7. C7420 Fiber C/Port SpecificationsDimensions Approximately 1.6–inches H x 9.5–inches W x 5.2–inches D
Regulatory Compliance • 43Appendix C. Regulatory ComplianceC/Port and MVXElectroMagnetic Compatibility (EMC) The statements contained within this sect
44 • Regulatory Compliance• EN 61000-4-5: 1995, Surge Immunity Requirements, performance criteria: 2/1 kV• EN 61000-4-6: 1996, Conducted Disturbance I
Regulatory Compliance • 45Declaration of ConformityManufacturer:ClearCube Technology, Inc.8834 Capital of Texas Highway NAustin, TX 78759Declares that
46 • Regulatory ComplianceC7420 Fiber C/Port and F6150–160 Fiber TransceiverElectroMagnetic Compatibility (EMC) The statements contained within this s
Regulatory Compliance • 47Power Harmonics and FlickerOther requirements that this equipment has been found to comply with are:• EN 61000-3-2: 1995, Li
48 • Regulatory ComplianceSafety: • EN60950:2000 • EN60825-1:1994 +A1+A2 (Laser Class 1 Product) EMC: • EN55022:1998 • EN55024:1998 • EN61000-4-2:1995
P/N G020075 Rev B
Preface • viiPrefaceHow to Use this GuideThank you for purchasing your quality ClearCube products. The ClearCube Architecture was developed to bring y
viii • PrefaceClearCube Technology is committed to meeting the requirements of the European Union WEEE Directive and is currently developing country-s
Preface • ixThese same symbols are used within this document where appropriate to indicate situations that merit checking this or another manual, or s
Kommentare zu diesen Handbüchern